DRIVEWAYS & PATHS

Gravel calculator.

From a little garden path to a new driveway. Work out your gravel volume, estimated weight and material budget.

01 / YOUR SPACE

Let’s size it up.

Material & ordering options

USD estimate only. Delivery, tax, labor and supplier minimums are excluded.

THE NUMBERS, EXPLAINED

A clear estimate in a few steps.

Measure the space you want to cover. For a rectangular area, enter its length and width. For a circular area, choose Circle and enter the diameter—the distance all the way across its center. Enter the additional depth of material you need, rather than the total depth of any existing layer.

Use “Add another area” for separate beds, sections of a driveway or parts of an L-shaped space. Avoid overlapping sections: the calculator adds every area you enter. Each section can have a different depth.

Gravel suppliers may sell by volume or weight. Our volume result comes from your dimensions. The weight result also depends on the bulk density you enter. The starting density of 1.4 US tons per cubic yard is only an example; check the actual product with your supplier.

Here’s the math.

Cubic yards = length (ft) × width (ft) × depth (in) ÷ 324

There are 12 inches in a foot and 27 cubic feet in a cubic yard, so the conversion factor is 12 × 27 = 324. For a circle, replace length × width with π × (diameter ÷ 2)². For metric measurements, volume in cubic meters is length × width × depth in centimeters ÷ 100; divide that volume by 0.764554857984 to get cubic yards.

A worked example

A 20-foot-long, 10-foot-wide area filled 4 inches deep needs 800 ÷ 324 = 2.469 cubic yards before allowance. With a 5% allowance, that becomes approximately 2.593 cubic yards. At an assumed density of 1.4 US tons per cubic yard, the weight is approximately 3.630 US tons.

How much will one cubic yard cover?

These theoretical coverage figures assume an even layer, with no allowance for losses or compaction.

Layer depthCoverage per yd³
1 inch324 square feet
2 inches162 square feet
3 inches108 square feet
4 inches81 square feet
6 inches54 square feet

Know what the estimate leaves out.

Real ground is uneven. Material can settle, compact or spill. The default 5% allowance is a starting assumption you control; it is not a compaction factor or an installation specification. Ask your supplier or installer what is suitable for your project. Price results multiply your material quantity by your entered price and exclude delivery, taxes and labor.

Good questions. Straight answers.

How do I calculate cubic yards?

For a rectangle measured in feet with depth in inches, multiply length × width × depth and divide by 324. For a circle, multiply π × (diameter ÷ 2)² × depth and divide by 324. Add the volumes of separate areas, then apply any allowance.

How many tons are in a cubic yard of gravel?

There is no single fixed answer. Multiply cubic yards by your supplier’s bulk density in US tons per cubic yard. This tool starts at an illustrative 1.4; change it for the actual gravel you are ordering.

Does the result include extra material?

Yes. The initial allowance is 5%, which you can change from 0% to 50%. The result shows both measured volume and your allowance. This setting is a planning assumption, not a recommendation for every installation.

Can I calculate a project in meters?

Yes. Choose Meters & cm, enter length and width in meters and depth in centimeters. Changing units converts measurements already entered. Results include cubic yards and cubic meters; gravel weight is labeled in US tons.

Is the cost an actual supplier quote?

No. Enter a price from your supplier to estimate material cost. Delivery, tax, labor, minimum orders and supplier rounding are excluded. No prices are fetched automatically.